2017.11.28 trouble,trouble,trouble

Today,my colleague is on bussiness trip。 going to customer factory in jiangxi。 slove the color difference problem of LCD screen。so ,I‘m in charge of all his projects。 Add my own projects,It's  make me crazy!

1 Slove problem。

a.cypress model  trst failure.

The quality personnel found the problem in the spot check,There are two NG products in 50 products.

I need  speed some times to test it and  give analysis results in today。

2017.11.28 trouble,trouble,trouble_第1张图片

bacceptance the test device (FCT)

Provide  25 pcs ok sample and 5 pcs NG products to test。QC supervision the test and make sure everyone is ok。

2017.11.28 trouble,trouble,trouble_第2张图片

cEQ for  pcb

check

2017.11.28 trouble,trouble,trouble_第3张图片

dRX/TX test

omitted。。。。。。。。。。。

eproject meeting

Discuss changes in engineering design。

Falternative induction test

2017.11.28 trouble,trouble,trouble_第4张图片