英文面试
1 英文自我介绍
Q1. introduce yourself ,please? can you sell yourself in 2 minutes?
A1: OK,面试官,下午好,我叫bill,我2018年毕业,此后一直从事软件测试工作。我上一家任职的公司名字是杭州爱软测信息技术有限公司,作为一名软件测试工程师,在我的工作中,我主要负责功能测试、用户体验测试和自动化测试,还包括UI自动化测试和界面自动化测试,常见的测试工具如:postman、fiddler、jmeter、tapd,我的主要项目经验是金融项目、电子商务平台。当然,查找和提交 bug,并验证 bug 是否修复是我工作的重要组成部分,同时,我还需要编写测试用例、测试报告和其他项目文档。这是我的一般情况,谢谢。
Ok,Interviewer,good afternoon, my name is Bill, I graduated in 2018 and have since worked in software testing.The name of the company I last worked for was Hangzhou iruance Information Technology Co., Ltd. As a software test engineer, in my work, I am mainly responsible for functional testing, user experience testing and automated testing, including UI automation testing and interface automation testing, the common testing tools such as: postman, fiddler, jmeter, tapd,my main project experience is in financial projects, e-commerce platform. Of course, finding and submitting bugs, and verify the bug is fixed that is an important part of my job, at the same time, I also need to write test cases, test reports and other project documents. This is mine general situation, thank you.
2.你最近一个项目的工作职责?
Q2.what your job responsibilty in the last project?
OK,在这个项目中,我主要负责需求分析,测试用例设计和编写,评审;然后是UI自动化测试,界面自动化测试;在SIT测试环境中执行我自己的测试用例并查找软件错误,以及提交错误以验证我们的开发同事是否修复了错误。配合并支持我的PM的工作,并与团队成员讨论项目的业务问题和解决方案。同时,输出每日测试报告。
OK, in this project, I'm mainly responsible for the requirements analysis, test case design and writing, review; then UI automation testing, interface automation testing; executing my own test cases in SIT test environment and finding software bugs, as well as submitting bugs to verify that bugs are fixed by our development colleagues. Cooperate with and support the work of the my PM, and discuss the business problems and solutions of the project with the team members. At the same time, output the daily test report.
3.介绍一下你最近的项目情况?
Q3. intruduce your project ?
我最近项目名字叫WMS仓储管理系统:整个项目业务框架由上游系统ERP和WMS,WCS,PMS系统直接的交互,完成入库,出库的基本业务。以入库业务流程为例:
1.上游的ERP系统发起入库请求(调用入库单创建接口)到公共接口:淘宝的奇门API,然后再请求到我们的WMS系统,
2.WMS系统收到入库到货通知,对入库清单内容进行检查,
3.通过后,WMS调用PMS系统的满仓查询接口,WMS收到PMS的上架口信息,
4.下一步,WMS向WCS系统发送上架任务下发请求,入库货物通过WCS的流水线,到达上架口,
5.WMS这时收到上架口确认信息,然后调用PMS进行抓箱和放箱落位,
6.上架任务完成,PMS通知WMS,入库请求完成,
7.最后WMS回调ERP系统入库单确认接口,入库动作结束。
My recent project name is WMS Warehouse Management System: the entire project business framework is directly interacted by the upstream system ERP and WMS, WCS, PMS system to complete the basic business of inbound and outbound. Take the inbound business flow of as an example:
1.The upstream ERP system send an inbound request (call the inbound single creation interface) to the public interface: Taobao's Qimen API, and then requests to our WMS system.
2.The WMS system receives the arrival notification and checks the contents of the inbound list.
3.After passing, WMS calls the full position query interface of the PMS system, and WMS receives the response information from the PMS.
4.next step, WMS sends a request to the WCS system for the listing task, and the goods pass through the WCS's assembly line to reach the shelf port.
5.WMS receives the shelf port confirmation information at this time, and then calls the PMS to grab the box and put the box in place.
6.The listing task is completed, PMS notifies WMS, and the inbound request is completed.
7.Finally, the WMS callback ERP system inbound listing confirms the interface, and the inbound action ends.
==========================
我做的这项目名字叫中国银行客户端系统,其主要的功能就是对用户进行储蓄,放贷,投资等资金管理的业务行为,比如贷款的业务这个核心的系统业务:主要就是,大的方向讲