PP-PP和其他模块的集成

PP-SD

  • Availability Check
  • MTO Scenario-MRP Run, Requirement Types
  • Variant Configuration - Selection/requirements of BOM Components and operation

PP-MM

  • Goods movements - Backflush, Auto Goods Receipt
  • STO, Reservation created for Production Order/Planning
  • Creation of Purchase Requisitions, Purchase orders with MRP Run
  • Quota arrangements/info record usage for sub-contracting/to choose the right vendor

PP-CO

  • Price update in material master
  • Assigning price to activity type for the specific period in the fiscal year.
  • Activity Type in the Cost center assigned in the WorkCenter
  • Order Type - Settlement Profile, Costing & Valuation Variants
  • Product cost Collector
  • Standard Cost Estimate
  • WIP & Variance Calculation
  • Costing Sheets for overheads

PP-FI

  • Account posting entries for each Goods movement related to PP with Valuation Class, Material Type & Movement Type

PP-QM

  • Inprocess inspection with Inspection Type 03-Discrete(AfterProduction Order Release)& 13-Repetetive Manufacturing(Manually through MFPR)
  • Goods Receipt inspection with Inspection Type 04 for both Discrete & Repetitive Manufacturing

PP-PS

  • BOM transfer (CN33)to required projectwith BOM usage 3 (Universal).
  • Components assigned to WBS and/or Network in the Project.
  • If the components are attached to WBS, than they areplanned with respect the project system. MRP is run at Project level (MD51). Theprocured material attached to WBS are reseverd as project stock against the the particular project.
  • The component attached to network are planned at plant level and are reserved as plant stock.

其他相关链接:

FI--Integration of FICO with Other Modules

http://blog.csdn.net/CompassButton/archive/2007/09/09/1777695.aspx

SD--sap的SD, FI,MM的业务集成和SD业务常用到重要函数

http://blog.csdn.net/CompassButton/archive/2006/08/15/1066926.aspx

source url:https://www.sdn.sap.com/irj/scn/wiki?path=/dashboard.action

你可能感兴趣的:(.net,Blog)