jira按照自然周过滤

project = PROJECT-KEY AND issuetype = Story AND status in (开始, 开发中, 待测试, 已评审, 待产品验证, 待线上验证) AND 计划完成日期 >= startOfWeek("+1w") AND 计划完成日期 <= endOfWeek("+1w") order by createdDate DESC

 

endOfMonth()
endOfMonth("inc")
where inc is an optional increment of (+/-)nn(y|M|w|d|h|m). If the time unit qualifier is omitted, it defaults to the natural period of the function, e.g. endOfMonth("+1") is the same as endOfMonth("+1M"). If the plus/minus (+/-) sign is omitted, plus is assumed.

 

你可能感兴趣的:(jira)