Council 常见检查类型

IFO Foundation

也就是地基检查。
An inspection of strip or bored pile foundations before the concrete is poured.

ICB Concrete block

就是常说的Block检查。
An inspection of block work construction, cast in situ panels, columns or walls before the concrete is poured.

ITK Waterproofing Membrane (select for internal and external waterproofing)

防水检查。
An inspection of below-ground wall requiring waterproofing.
An inspection of a roof, deck or internal wet area membrane. Deck and roof membrane also covered in wet area inspection.

IPP Plumbing (underslab or plumbing preline)

水路检查,如果在Slab下,要在浇水泥前检查,叫做Underslab。
An inspection of any plumbing works in any part of the building including the floor slab.
Use IPB inspection type if preline plumbing and preline building inspections are being booked together.

ISF Floor slab

也就是Slab检查,要在Slab水泥浇筑前检查。
An inspection, excluding plumbing, of any floor slab and its associated building work before the concrete is poured.

IFG Framing (select for Reclad strip-off or Reclad remedial) 木架检查。

A detailed inspection of the timber structure of the building before the roof cladding and building wraps are installed.
This includes reclad strip-off and reclad remedial inspections.

ICA Cavity Wrap

包墙检查。

ICL Cladding

外墙检查。

IPB Building preline (select when booking preline plumbing and preline building together)

封板前检查。

IPL Postline

封板后检查。

IDT Drainage

排水检查。
An inspection of any surface water or foul water drainage system associated with the building consent.
As-built drainage plans are required at your inspection to verify the completed work matches the original plans.

IF1 Residential Final (select for Fireplace)

Final检查。

IME Site Meeting

现场会议。