I graduated from Sichuan university in 2016,and now I working in Sinohydro Foundation , I firmly believe in the sentence: all the absolutely impossible things are only the limitations of technology and era, instead of humans' inteligence and abilities. Ngari in Tibet, with average altitude more than 4500meters ,and oxygen content less than 50% of the hinterland, is a medically recognized “restricted area of life”, which is not suitable for human habitation. However ,the builders of POWERCHINA don’t believe this assertion,and for years to explore the source of light in here.Tibet as one of the key 18 provinces of the belt and road initiative, Not only Ngari ,but also in Lallo,in Yalung and in Nyinchi left the footprints of young people of POWERCHINA with their responsibility, action and achievements.
Since it was started from July 21st,2014,Yalong reservoir project in Tibet has gone through more than 1000 days and nights, kept challenges and overcome difficulties,build hard sweat into the reinforced concrete,with a firm arm to control steel machinery, a dam like rainbow lies between two mountains with length of 383.7meters and height of 73.5 meters. On the 11.28,2017,the Yalong reservoir project has been successfully impounded, which is a great gift for the 19th session of National Congress of the CPC!Project department won the “national worker pioneer number”,and project leader -comrade Liu dianzhong won the “national upward to good youth”.
And I ‘m proud to become a member of the plateau hydropower construction of Sinohydro Foundation .From 1958 to now,we have undertaken and participated in over 3000 foundation projects. Only in Tibet which I know well, we have set many world records, although under alpine hypoxia ,bad weather and poor traffic. Now, I share some date with you :In Pondo, we have set three world records: fistly, the cutoff wall depth has reached 158 m, secondly, the joint pulling has reached 152 m and thirdly, the test trench depth has reached 201.47m. In the M project in Tibet ,the vibroflotation depth has exceed 90 meters by Innovative technology and equipment which set a new world record .In addition ,we also has been awarded the Luban prize,Zhan tianyou prize and so on.
We are Sinohydro Foundation man, we lack of oxygen but we don’t lack of spirit. By the spirit of “new day”, we prepare to meet challenges and try our best to complete the task. Even through the trials and tribulations, we have never changed the initial heart. As industry leaders ,we let the flag of POWERCHINA fly high on the snow-covered plateau.
We also leave footprint of“sinohydro foundation”on the blueprint of B&R in abroad. The Qasim Port Coal-Fired Power Station in Pakistan, as the first landing project of “China-Pakinstan economy corridor”,and China’s largest overseas thermal power projects, is the perfect project of B&R. In Thailand, a dozen or so mangers has completed 70000 square meters of industrial factory in five month and a half, which have set a new record for the construction of overseas industrial zone, It is real Chinese speed. Owner with sincere respect sent “special contribution award”to POWERCHINA. On the construction of B&R, our international operations has covered 28 countries.
As President Xi said: no matter how long the ancient silk routes and the maritime silk route, if we take the first courageous step towards each other, we can embark on a path leading to friendship, shared development, peace, harmony and a better future. Young friends, whether in motherland or abroad, let us join hands, shoulder the heavy burden, walk together, meet and know each other, measure the distance of silk route step by step, create a story of pursuing a dream on the journey of the belt and road.
Thanks for your listening !