Meeting Notes: Mar 7

Posted from https://sites.google.com/site/takeitandgoteam/meeting-notes/mar7

1. Discuss on team routine rule [All members]

2. Define Milestone 1, which focuses on experimental project. [All members]
3. Divide the team into two groups: iOS and Server. Assign works to them respectively. [All members]
4. Discuss about the assignment of HW 3 [wd, Amber]
5. Introduction to iPad Development [iOS Group]
    5.1 Xcode Introduction
    5.2 Memory Management Introduction
    5.3 Installation development environment on PC.
    5.4 Scenarios of User experience  
        5.4.1  Login Page
        5.4.2  Library Sidebar
        5.4.3  Paper Viewer
          5.4.3.1 Smooth Interaction
          5.4.3.2 Add and Edit Comment
          5.4.3.3 Highlighting
          5.4.3.4 Reference Discovering
6. Decision making on Server backend [Server Group]
    6.1 Survey on Google App engine, Dropbox API for our storage service.
           Consider their convenience, feasibility and limitation (such as storage space size, synchronization)
    6.3 Propose some features. 
          6.3.1 Shared Comments.
          6.3.2 Socialized Translation. 
          6.3.3 Online file manager.
          6.3.4 Auto sync.
 

你可能感兴趣的:(Note)