053题库错题

510.You executed the following command in Recovery Manager (RMAN):
RMAN> REPORT NEED BACKUP days 3;
What is the output of this command?
A. a list of files that require a backup within three days
B. a list of files requiring more than 3 days of archive logs to apply
C. a list of files that RMAN recommends be backed up only once in every three days, based on low
volatility
D. a list of files for which a backup has already been performed in the last three days and which is
required to be backed up again based on the high number of transactions performed on them

正确答案:B

RMAN>REPORT NEED BACKUP days 3这个命令显示的是之前三天没有备份的文件,如果在期间出了问题要恢复需要与这三天最近的归档文件来恢复。

Which two statements correctly describe the relationship among the Scheduler components: job, program,
and schedule? (Choose two)
A. A job is specified as part of a program definition
B. A program can be used in the definition of multiple jobs
C. A program and job can be specified as part of a schedule definition
D. A program and schedule can be specified as part of a job definition
正确答案:BD

你可能感兴趣的:(053错题)